Wiki&Future
Login · Register
Education guide

Curriculum and Academic Progress Resources

Public research notes

Downloaded or verified through 2026-08-27 from official school, Issaquah School District or Washington OSPI sources.

Cedar Trails, Grand Ridge, Cascade Ridge and Endeavour use the same district curriculum, grading system and district assessments. School-specific differences are primarily found in each School Improvement Plan (SIP), instructional implementation and classroom practice.

Quick answer: how a prospective student's progress would be tracked

Tool Kindergarten use What the family receives
WaKIDS Used at the start of kindergarten to understand the whole child and support the transition into school Teacher/family connection and observational information
Classroom work and teacher observation Ongoing Work samples, class communications, conferences and teacher feedback
i-Ready Reading Kindergarten literacy screening twice during the year Scores in Family Access/test-score communication
Rapid Automatized Naming (RAN) One early-literacy screening Used with literacy results to identify possible areas of difficulty
i-Ready Math District diagnostic assessment beginning in kindergarten Family score report and instructional planning information
Standards-based report card End of semester 1 and semester 2 Academic scores from 1–4 and behavior indicators C/M/E/G
State assessments Not administered in kindergarten ELA/math begin in grade 3; science begins in grade 5

The district says assessment results are used to adjust instruction, identify learning difficulties early and plan interventions. They should be considered together with classroom performance and teacher observations.

Kindergarten curriculum overview

Area District curriculum or approach
Reading Benchmark Advance, Benchmark Phonics, Heggerty phonemic awareness, decodable texts and i-Ready
Writing Benchmark Advance and Handwriting Without Tears
Math Eureka Math, supported by Zearn and i-Ready Math
Science Amplify Science, including hands-on investigation and literacy activities
Social studies District-created inquiry units aligned with Washington standards
Social-emotional learning Washington SEL standards and district instruction
Specialists Music, physical education and library learning

The district is scheduled to introduce a newly reviewed elementary math curriculum in fall 2027. Therefore, Eureka Math may be replaced; this should be checked again in spring or summer 2027.

Understanding the report card

Academic scale

  • 4 — Mastery: strong accuracy and fluency plus deep thinking and transfer to new contexts.
  • 3 — Proficient: understands core ideas and essential skills, with support or scaffolding where appropriate.
  • 2 — Basic: understands much of the content but has gaps and needs more support.
  • 1 — Below grade level: is primarily developing prerequisite skills and needs significant support.

Behaviors that promote learning

  • C — Consistently demonstrates age-level behaviors.
  • M — Meeting age-level behavior expectations.
  • E — Emerging grade-level skills.
  • G — Growth area receiving support.

Kindergarten reporting includes foundational reading, informational and literary comprehension, vocabulary, grammar, informational/opinion/narrative writing, math domains, behaviors that promote learning, and unit-based science and social studies. Kindergarten students do not receive the specialist skills grade used in higher elementary grades for music and PE.

Shared downloaded files

Original documents

Offline snapshots of official webpages

HTML snapshots preserve the information available on the download date. Use the live links below to check for revisions before a prospective student enrolls.

School-specific academic plans

Seattle Public Schools shared curriculum

  • Complete kindergarten curriculum and progress-tracking archive for Bryant and View Ridge.
  • Includes current Emerge! literacy, enVision math, Amplify science, social studies, SEL, PE, arts, MAP and trimester progress-report materials.
  • Full licensed teacher/student editions are not reproduced; official public scope, unit and assessment materials are preserved offline.

Cedar Trails

  • 2024–26 School Improvement Plan snapshot.
  • Primary themes include Benchmark literacy implementation, MTSS, Universal Design for Learning and better tracking of Tier 2 and Tier 3 supports.
  • The plan identifies i-Ready, formative assessments, Eureka module assessments/exit tickets, behavioral data and attendance as progress-monitoring evidence.

Grand Ridge

  • 2024–26 School Improvement Plan snapshot.
  • Primary themes include Benchmark literacy implementation, Universal Design for Learning and more data-driven Tier 2 support.
  • Published targets include third-grade phonics performance and grades 3–5 SBA math performance, including gap-closing targets for focus groups and students with disabilities.

Cascade Ridge

  • Live 2024–26 School Improvement Plan.
  • Primary themes include reading growth, Benchmark literacy, intervention blocks and Universal Design for Learning.
  • The school also hosts the district's north grade 4–5 Science Technology Magnet campus; this is not part of its kindergarten curriculum.

Endeavour

  • Live 2024–26 School Improvement Plan.
  • Primary themes include foundational literacy, inclusionary practices, Universal Design for Learning and tiered academic and behavioral support.
  • Endeavour hosts one of the district's two grade 3–5 MERLIN sites; SAGE remains the neighborhood-school highly capable service for identified students who are not in MERLIN.

View Ridge Elementary

Bryant Elementary

McDonald International Elementary

Private-school curriculum archives

Private schools do not use the Issaquah district curriculum or public-school improvement plans. Their available curriculum and progress-reporting materials are organized separately:

Live official sources

Update checklist for 2027

  • Confirm which math curriculum will replace or continue Eureka Math.
  • Download the current blank kindergarten report card.
  • Confirm the i-Ready kindergarten testing schedule and family-report format.
  • Replace the 2024–26 SIP snapshots with the new planning cycle.
  • Check whether kindergarten specialist grading or report-card categories changed.

Change log

  • 2026-08-27: Added Cascade Ridge and Endeavour school-specific academic context and live improvement-plan sources.
  • 2026-08-22: Initial curriculum and progress-tracking archive created.