Downloaded or verified through 2026-08-27 from official school, Issaquah School District or Washington OSPI sources.
Cedar Trails, Grand Ridge, Cascade Ridge and Endeavour use the same district curriculum, grading system and district assessments. School-specific differences are primarily found in each School Improvement Plan (SIP), instructional implementation and classroom practice.
Quick answer: how a prospective student's progress would be tracked
| Tool | Kindergarten use | What the family receives |
|---|---|---|
| WaKIDS | Used at the start of kindergarten to understand the whole child and support the transition into school | Teacher/family connection and observational information |
| Classroom work and teacher observation | Ongoing | Work samples, class communications, conferences and teacher feedback |
| i-Ready Reading | Kindergarten literacy screening twice during the year | Scores in Family Access/test-score communication |
| Rapid Automatized Naming (RAN) | One early-literacy screening | Used with literacy results to identify possible areas of difficulty |
| i-Ready Math | District diagnostic assessment beginning in kindergarten | Family score report and instructional planning information |
| Standards-based report card | End of semester 1 and semester 2 | Academic scores from 1–4 and behavior indicators C/M/E/G |
| State assessments | Not administered in kindergarten | ELA/math begin in grade 3; science begins in grade 5 |
The district says assessment results are used to adjust instruction, identify learning difficulties early and plan interventions. They should be considered together with classroom performance and teacher observations.
Kindergarten curriculum overview
| Area | District curriculum or approach |
|---|---|
| Reading | Benchmark Advance, Benchmark Phonics, Heggerty phonemic awareness, decodable texts and i-Ready |
| Writing | Benchmark Advance and Handwriting Without Tears |
| Math | Eureka Math, supported by Zearn and i-Ready Math |
| Science | Amplify Science, including hands-on investigation and literacy activities |
| Social studies | District-created inquiry units aligned with Washington standards |
| Social-emotional learning | Washington SEL standards and district instruction |
| Specialists | Music, physical education and library learning |
The district is scheduled to introduce a newly reviewed elementary math curriculum in fall 2027. Therefore, Eureka Math may be replaced; this should be checked again in spring or summer 2027.
Understanding the report card
Academic scale
- 4 — Mastery: strong accuracy and fluency plus deep thinking and transfer to new contexts.
- 3 — Proficient: understands core ideas and essential skills, with support or scaffolding where appropriate.
- 2 — Basic: understands much of the content but has gaps and needs more support.
- 1 — Below grade level: is primarily developing prerequisite skills and needs significant support.
Behaviors that promote learning
- C — Consistently demonstrates age-level behaviors.
- M — Meeting age-level behavior expectations.
- E — Emerging grade-level skills.
- G — Growth area receiving support.
Kindergarten reporting includes foundational reading, informational and literary comprehension, vocabulary, grammar, informational/opinion/narrative writing, math domains, behaviors that promote learning, and unit-based science and social studies. Kindergarten students do not receive the specialist skills grade used in higher elementary grades for music and PE.
Shared downloaded files
Original documents
- Blank kindergarten report card — the district's English report-card form introduced in 2024–25.
- Kindergarten math parent tip sheets — Eureka Math family guide; may become outdated when the planned 2027 math adoption occurs.
- Washington SEL standards one-page summary.
Offline snapshots of official webpages
- Kindergarten curriculum and learning progression.
- Elementary report-card and grading guide.
- District assessment system.
- Understanding the i-Ready family report.
- Kindergarten readiness guide.
HTML snapshots preserve the information available on the download date. Use the live links below to check for revisions before a prospective student enrolls.
School-specific academic plans
Seattle Public Schools shared curriculum
- Complete kindergarten curriculum and progress-tracking archive for Bryant and View Ridge.
- Includes current Emerge! literacy, enVision math, Amplify science, social studies, SEL, PE, arts, MAP and trimester progress-report materials.
- Full licensed teacher/student editions are not reproduced; official public scope, unit and assessment materials are preserved offline.
Cedar Trails
- 2024–26 School Improvement Plan snapshot.
- Primary themes include Benchmark literacy implementation, MTSS, Universal Design for Learning and better tracking of Tier 2 and Tier 3 supports.
- The plan identifies i-Ready, formative assessments, Eureka module assessments/exit tickets, behavioral data and attendance as progress-monitoring evidence.
Grand Ridge
- 2024–26 School Improvement Plan snapshot.
- Primary themes include Benchmark literacy implementation, Universal Design for Learning and more data-driven Tier 2 support.
- Published targets include third-grade phonics performance and grades 3–5 SBA math performance, including gap-closing targets for focus groups and students with disabilities.
Cascade Ridge
- Live 2024–26 School Improvement Plan.
- Primary themes include reading growth, Benchmark literacy, intervention blocks and Universal Design for Learning.
- The school also hosts the district's north grade 4–5 Science Technology Magnet campus; this is not part of its kindergarten curriculum.
Endeavour
- Live 2024–26 School Improvement Plan.
- Primary themes include foundational literacy, inclusionary practices, Universal Design for Learning and tiered academic and behavioral support.
- Endeavour hosts one of the district's two grade 3–5 MERLIN sites; SAGE remains the neighborhood-school highly capable service for identified students who are not in MERLIN.
View Ridge Elementary
- Seattle curriculum, progress-reporting and View Ridge improvement-plan archive.
- School-specific full-day kindergarten curriculum snapshot.
- 2025–26 Continuous School Improvement Plan.
- View Ridge uses Seattle Public Schools curriculum rather than Issaquah materials. Current highlights include Emerge! structured literacy, enVision Mathematics, DIBELS literacy screening, MAP, curriculum-embedded assessments and trimester Elementary Progress Reports.
Bryant Elementary
- Seattle curriculum, advanced-learning and Bryant improvement-plan archive.
- 2025–26 Continuous School Improvement Plan.
- Bryant uses the same current Seattle district curriculum and progress-reporting framework as View Ridge, with a particularly detailed whole-child kindergarten philosophy and inclusive advanced-learning practices.
- Bryant's public grade-level curriculum page contains some outdated program names; the archive clearly separates those historical descriptions from current district adoptions.
McDonald International Elementary
- Spanish/Japanese immersion curriculum and progress-tracking archive.
- 2025–26 Continuous School Improvement Plan.
- Students spend half the day in English and half in Spanish or Japanese; math and science are taught primarily in the target language.
- Public pages contain conflicting current/older curriculum names, so the archive flags Emerge! versus Collaborative Classroom and enVision versus Math in Focus for direct verification.
Private-school curriculum archives
Private schools do not use the Issaquah district curriculum or public-school improvement plans. Their available curriculum and progress-reporting materials are organized separately:
- Open Window School — gifted K–8 curriculum overview and progress-reporting notes.
- Seattle Country Day School — inquiry-based gifted K–8 curriculum, narrative reporting and admissions resources.
- University Child Development School — multi-age Early Elementary curriculum, UCDS Continua, portfolio assessment and admissions resources.
- Our Lady of the Lake Catholic School — Catholic K–8 curriculum, trimester progress reporting, family handbook, admissions, tuition and support resources.
Live official sources
- Kindergarten curriculum
- Elementary report card
- District assessments
- Understanding i-Ready scores
- Kindergarten early-literacy screening
- Kindergarten readiness guide
- Curriculum review cycle
- Cedar Trails School Improvement Plan
- Grand Ridge School Improvement Plan
- Cascade Ridge School Improvement Plan
- Endeavour School Improvement Plan
Update checklist for 2027
- Confirm which math curriculum will replace or continue Eureka Math.
- Download the current blank kindergarten report card.
- Confirm the i-Ready kindergarten testing schedule and family-report format.
- Replace the 2024–26 SIP snapshots with the new planning cycle.
- Check whether kindergarten specialist grading or report-card categories changed.
Change log
- 2026-08-27: Added Cascade Ridge and Endeavour school-specific academic context and live improvement-plan sources.
- 2026-08-22: Initial curriculum and progress-tracking archive created.